The Sydney Metro WSA SBT project is the design and construction of twin 9.8km tunnels and station boxes connecting St Marys with Orchard Hills and the Airport Business Park with the new airport city centre, Aerotropolis (Bradfield).
The project provides a key transport connection to the new Western Sydney International Airport.
The works included TBM and roadheader tunnelling works, tunnel permanent lining, dive structures, and the excavation and support of 5 station boxes and 3 shafts.
JAGCON Group worked with the CPB Contractors Ghella Joint Venture (CPBG) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.
Project Delivery Roles:
– Construction Manager
– Precast Manager
– Senior Project Engineer
– Senior Electrical Engineer
– Project Engineer
– Site Engineer
– Methods and Planning Designer
– Environmental Manager
– Community Relations Manager
Battery of The Nation (BoTN)
Tarraleah, TAS
The Tarraleah Redevelopment Project is part of Hydro Tasmania’s Battery of the Nation initiative, aimed at upgrading the existing hydropower system to increase capacity and flexibility.
The project will enhance the Tarraleah scheme, one of Tasmania’s most important power stations, with a new 190 MW power station located adjacent to the existing one in the Nive Valley.
– Construction of new pressurised tunnels and a pipeline to transfer water from Lake King William.
– A 12 km headrace tunnel and 4.2 km pipeline to convey water to the new power station.
– Installation of a 70m high surge tower to manage water pressure.
– New transmission corridor (16 km) to link with existing transmission lines.
– Construction workforce of up to 250 people, with a peak construction period of four years.
– Development of workforce accommodation co-located with the existing Tarraleah village.
– Decommissioning of the old Tarraleah Power Station and related infrastructure.
JAGCON Group were engaged to assist in the development of the project at feasibility stage prior to project approval by providing consultancy services to develop the civil construction methodology and assist with project schedule development.
JAGCON Group have also undertaken critical review for the Lake King William upgrade works including support on site during delivery.
Project Services:
– Development of civil construction methodology and project schedule
– Critical reviews of ancillary works
– Assistance in contract development
– On site support during delivery
– Review of costing and estimate for the project
– Assistance with a variety of tasks to facilitate project development
The M7-M12 Integration Project involves widening the M7 Motorway & creating a connection to the new M12 Motorway.
Key construction activities include earthworks, vegetation trimming, utility installation, & the construction of 7 new bridges at the M7-M12 Interchange.
JAGCON Group worked with John Holland providing project management services, expert advice on constructability, and senior engineers throughout the lifecycle of the project.
Project Delivery Roles:
– Area Manager
– Project Engineer
Project Services:
– Planning and Constructability
– Project Management
The NSW Government is delivering Sydney Metro West – a new underground metro railway which will double rail capacity between Parramatta and the Sydney CBD, link new communities to rail services and support employment growth and housing supply. The Gamuda and Laing O’Rourke Consortium (GLC) is delivering the Sydney Metro West – Western Tunnelling Package. The project involves nine kilometres of twin metro rail tunnels between Westmead and Sydney Olympic Park, excavation for two new metro stations, a stabling and maintenance facility at Clyde, and a precast facility at Eastern Creek.
– Twin 9km tunnels from Sydney Olympic Park to Westmead
– A Tunnel Boring Machine launch site at Rosehill, tunnelling first towards Sydney Olympic Park and relaunched from Rosehill towards Westmead
– Excavation for a services facility and crossover structure at Rosehill to allow provision for fresh air ventilation and emergency egress
– Tunnel portal and dive excavation at Clyde Stabling and Maintenance Facility
– Earthworks, retaining structures, drainage and utilities corridor for the Clyde Stabling and Maintenance Facility
– Excavation and civil works for Parramatta and Westmead stations
– A segment manufacturing facility at Eastern Creek constructing over 60,000 segments to line the twin tunnels
JAGCON Group worked with the Gamuda and Laing O’Rourke Consortium (GLC) providing engineering services.
Project Delivery Roles:
– Project Engineer
Project Services:
– Planning & Constructability
The Sydney Metro West Central Tunnelling Package (CTP) is the design and construction of 11km of twin metro tunnels and station box excavation connecting The Bays Precinct and Sydney Olympic Park.
The works include tunnelling through complex geology, underground cavern excavation, and station box construction at The Bays, Five Dock, Burwood, North Strathfield, and Sydney Olympic Park.
JAGCON Group worked with Acciona Ferrovial Joint Venture (AFJV) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.
Project Delivery Roles:
– Tunnel Manager
– Interface and Handover Manager
– Senior Project Engineers
– Project Engineer
– Subject Matter Expert
Project Services:
– Planning & Constructability
– Project Management
– Value Engineering
– Claims & Variations Assistance
– Contract Administration
– SME Reviews
– Strategic Advice
– Ventilation
The Sydney Metro West Eastern Tunnelling Package (ETP) is the design and construction of 3.5km of twin metro tunnels and station excavation connecting The Bays Precinct and Hunter Street in Sydney CBD.
The works include demolition and shaft and underground cavern excavation at both Pyrmont and Hunter Street, including complex permanent structural lining.
JAGCON Group worked with the John Holland CPB Contractors Ghella Joint Venture (JCG) on this project providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.
Project Delivery Roles:
– Precast Manager
– Area Manager
– Senior Project Engineers
– Project Engineer
– Senior Methods Engineer
– Digital Engineer
Project Services:
– Planning & Constructability
– Digital Engineering
– Project Management