The Sydney Metro WSA SBT project is the design and construction of twin 9.8km tunnels and station boxes connecting St Marys with Orchard Hills and the Airport Business Park with the new airport city centre, Aerotropolis (Bradfield).
The project provides a key transport connection to the new Western Sydney International Airport.
The works included TBM and roadheader tunnelling works, tunnel permanent lining, dive structures, and the excavation and support of 5 station boxes and 3 shafts.
JAGCON Group worked with the CPB Contractors Ghella Joint Venture (CPBG) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.
Project Delivery Roles:
– Construction Manager
– Precast Manager
– Senior Project Engineer
– Senior Electrical Engineer
– Project Engineer
– Site Engineer
– Methods and Planning Designer
– Environmental Manager
– Community Relations Manager
Transport for NSW’s M6 Stage 1 project features twin 4km tunnels linking the M8 Motorway at Arncliffe to President Avenue at Kogarah. The works involve complex roadheader tunnelling through varying geology, the construction of a dive portal structure, and upgrades and tie-ins to existing road infrastructure.
– 4km twin road tunnels
– Excavation:
– Roadheaders in Hawkesbury Sandstone
– Excavators in sands and clay with jet-grouting treatment
– 125m open cut + 230m cut & cover excavation (with top-down construction method)
– 2 caverns: section up to 267m²
– 3-lane tunnels: section up to 182m²
– 27 cross passages
JAGCON Group worked with the CPB Contractors, Ghella and UGL joint venture (CGU) providing project management services, constructability advice & senior engineers throughout the lifecycle of the project.
Project Delivery Roles:
– Senior Project Engineer
– Project Engineers
– Site Engineers
– Quality Administrator
Project Services:
– Planning & Constructability
– Quality Assurance
Sydney Gateway is the “missing link” that connects Sydney’s motorway network to Sydney Airport. The project consists of over 5km of new road including 19 new bridge structures, a new elevated flyover to the Domestic Terminals, and over 3km of new shared cycle and pedestrian pathway.
The project was delivered successfully despite facing significant complexities and constraints in its interfaces with live traffic and airspace.
JAGCON Group worked with the John Holland Seymour Whyte Joint Venture providing support in managing work permits and interface agreements with key stakeholders including Sydney Airport and the Airport Building Controller.
Project Services:
– Interface Management
– Stakeholder Management
– Boots-On-Ground Delivery Personnel
Project Delivery Roles:
– Permit Coordinator
Australian Precast Solutions (APS), established in 2008, operates a purpose-built precast concrete facility in Macksville, NSW.
The company specialises in manufacturing a variety of prestressed and reinforced concrete products, including Super-T bridge beams, planks, girders, noise walls, barriers, arches, and custom-designed elements.
JAGCON Group worked with Australian Precast Solutions (APS) providing project management and engineering support.
Project Delivery Roles:
– Project Manager
– Project Engineer
– Site Engineer
Project Services:
– Engineering Management
– Project Delivery
The first stage of the Suburban Rail Loop – SRL East – is a fully-tunnelled 26-kilometre metro corridor between Cheltenham in the South and Box Hill in the North. The line will include six stations, including new interchanges with existing heavy rail stations at Cheltenham, Clayton, Glen Waverley and Box Hill, with new stations at Monash and Burwood.
The Suburban Rail Loop Authority (SRLA) has separated SRL East into seven packages. Included in the scope of Works Package C is:
– Tunnelling and cross passages over the 16-kilometre Cheltenham and Glen Waverley section, and;
– Clayton and Monash station box excavations, including temporary retaining structures.
JAGCON Group worked with the CPB Contractors Ghella Acciona Joint Venture providing SME reviews, digital engineering support & senior engineers throughout the lifecycle of the project.
Project Services:
– SME Reviews
– Value Engineering
– Strategic Advice
– Planning & Constructability
– Digital Engineering
Project Delivery Roles:
– Senior Electrical Engineer
– Digital Engineer
The TSD project is the underground and brownfield rail surface works associated with the design and construction of the new Cross River Rail. The 10.2km railway includes 5.9km of twin tunnels running beneath the Brisbane River and CBD with four new underground stations at Boggo Road, Wolloongabba, Albert Street and Roma Street.
The project also provides a new above ground station at Exhibition, a rebuild for seven stations between Dutton Park and Salisbury, construction of three new stations on the Gold Coast, delivery of two new stabling and maintenance facilities, and commissioning of a new world class signalling system.
JAGCON Group worked with the CPB Contractors, BAM, Ghella, UGL Joint Venture (CBGUJV) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.
Project Services:
– SME Reviews
– Strategic Advice
– Planning & Constructability
Project Delivery Roles:
– Senior Project Engineer
– Project Engineers
– Site Engineer