Our Work

Sydney Metro West – Central Tunnelling Package (CTP)

Sydney, NSW

Project Description

The Sydney Metro West Central Tunnelling Package (CTP) is the design and construction of 11km of twin metro tunnels and station box excavation connecting The Bays Precinct and Sydney Olympic Park.

The works include tunnelling through complex geology, underground cavern excavation, and station box construction at The Bays, Five Dock, Burwood, North Strathfield, and Sydney Olympic Park.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with Acciona Ferrovial Joint Venture (AFJV) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.

Project Delivery Roles:
– Tunnel Manager
– Interface and Handover Manager
– Senior Project Engineers
– Project Engineer
– Subject Matter Expert

Project Services:
– Planning & Constructability
– Project Management
– Value Engineering
– Claims & Variations Assistance
– Contract Administration
– SME Reviews
– Strategic Advice
– Ventilation

Our Work

Sydney Metro West – Eastern Tunnelling Package (ETP)

Sydney, NSW

Project Description

The Sydney Metro West Eastern Tunnelling Package (ETP) is the design and construction of 3.5km of twin metro tunnels and station excavation connecting The Bays Precinct and Hunter Street in Sydney CBD.

The works include demolition and shaft and underground cavern excavation at both Pyrmont and Hunter Street, including complex permanent structural lining.

JCG JV Project Website

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the John Holland CPB Contractors Ghella Joint Venture (JCG) on this project providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.

Project Delivery Roles:
– Precast Manager
– Area Manager
– Senior Project Engineers
– Project Engineer
– Senior Methods Engineer
– Digital Engineer

Project Services:
– Planning & Constructability
– Digital Engineering
– Project Management

Our Work

Sydney Metro Western Sydney Airport – Station Boxes & Tunnelling (SBT)

Sydney, NSW

Project Description

The Sydney Metro WSA SBT project is the design and construction of twin 9.8km tunnels and station boxes connecting St Marys with Orchard Hills and the Airport Business Park with the new airport city centre, Aerotropolis (Bradfield).

The project provides a key transport connection to the new Western Sydney International Airport.

The works included TBM and roadheader tunnelling works, tunnel permanent lining, dive structures, and the excavation and support of 5 station boxes and 3 shafts.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the CPB Contractors Ghella Joint Venture (CPBG) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.

Project Delivery Roles:
– Construction Manager
– Precast Manager
– Senior Project Engineer
– Senior Electrical Engineer
– Project Engineer
– Site Engineer
– Methods and Planning Designer
– Environmental Manager
– Community Relations Manager

Our Work

M6 Stage 1

Sydney, NSW

Project Description

Transport for NSW’s M6 Stage 1 project features twin 4km tunnels linking the M8 Motorway at Arncliffe to President Avenue at Kogarah. The works involve complex roadheader tunnelling through varying geology, the construction of a dive portal structure, and upgrades and tie-ins to existing road infrastructure.

– 4km twin road tunnels

– Excavation:

– Roadheaders in Hawkesbury Sandstone
– Excavators in sands and clay with jet-grouting treatment

– 125m open cut + 230m cut & cover excavation (with top-down construction method)

– 2 caverns: section up to 267m²

– 3-lane tunnels: section up to 182m²

– 27 cross passages

TfNSW Website    CPB Website    Ghella Website    UGL Website

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the CPB Contractors, Ghella and UGL joint venture (CGU) providing project management services, constructability advice & senior engineers throughout the lifecycle of the project.

Project Delivery Roles:
– Senior Project Engineer
– Project Engineers
– Site Engineers
– Quality Administrator

Project Services:
– Planning & Constructability
– Quality Assurance

Our Work

Sydney Gateway

Sydney, NSW

Project Description

Sydney Gateway is the “missing link” that connects Sydney’s motorway network to Sydney Airport. The project consists of over 5km of new road including 19 new bridge structures, a new elevated flyover to the Domestic Terminals, and over 3km of new shared cycle and pedestrian pathway.

The project was delivered successfully despite facing significant complexities and constraints in its interfaces with live traffic and airspace.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the John Holland Seymour Whyte Joint Venture providing support in managing work permits and interface agreements with key stakeholders including Sydney Airport and the Airport Building Controller.

Project Services:
– Interface Management
– Stakeholder Management
– Boots-On-Ground Delivery Personnel

Project Delivery Roles:
– Permit Coordinator

Our Work

Australian Precast Solutions (APS)

Macksville, NSW

Project Description

Australian Precast Solutions (APS), established in 2008, operates a purpose-built precast concrete facility in Macksville, NSW.

The company specialises in manufacturing a variety of prestressed and reinforced concrete products, including Super-T bridge beams, planks, girders, noise walls, barriers, arches, and custom-designed elements.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with Australian Precast Solutions (APS) providing project management and engineering support.

Project Delivery Roles:
– Project Manager
– Project Engineer
– Site Engineer

Project Services:
– Engineering Management
– Project Delivery