Sydney Gateway is the “missing link” that connects Sydney’s motorway network to Sydney Airport. The project consists of over 5km of new road including 19 new bridge structures, a new elevated flyover to the Domestic Terminals, and over 3km of new shared cycle and pedestrian pathway.
The project was delivered successfully despite facing significant complexities and constraints in its interfaces with live traffic and airspace.
JAGCON Group worked with the John Holland Seymour Whyte Joint Venture providing support in managing work permits and interface agreements with key stakeholders including Sydney Airport and the Airport Building Controller.
Project Services:
– Interface Management
– Stakeholder Management
– Boots-On-Ground Delivery Personnel
Project Delivery Roles:
– Permit Coordinator
Australian Precast Solutions (APS), established in 2008, operates a purpose-built precast concrete facility in Macksville, NSW.
The company specialises in manufacturing a variety of prestressed and reinforced concrete products, including Super-T bridge beams, planks, girders, noise walls, barriers, arches, and custom-designed elements.
JAGCON Group worked with Australian Precast Solutions (APS) providing project management and engineering support.
Project Delivery Roles:
– Project Manager
– Project Engineer
– Site Engineer
Project Services:
– Engineering Management
– Project Delivery
The first stage of the Suburban Rail Loop – SRL East – is a fully-tunnelled 26-kilometre metro corridor between Cheltenham in the South and Box Hill in the North. The line will include six stations, including new interchanges with existing heavy rail stations at Cheltenham, Clayton, Glen Waverley and Box Hill, with new stations at Monash and Burwood.
The Suburban Rail Loop Authority (SRLA) has separated SRL East into seven packages. Included in the scope of Works Package C is:
– Tunnelling and cross passages over the 16-kilometre Cheltenham and Glen Waverley section, and;
– Clayton and Monash station box excavations, including temporary retaining structures.
JAGCON Group worked with the CPB Contractors Ghella Acciona Joint Venture providing SME reviews, digital engineering support & senior engineers throughout the lifecycle of the project.
Project Services:
– SME Reviews
– Value Engineering
– Strategic Advice
– Planning & Constructability
– Digital Engineering
Project Delivery Roles:
– Senior Electrical Engineer
– Digital Engineer
The TSD project is the underground and brownfield rail surface works associated with the design and construction of the new Cross River Rail. The 10.2km railway includes 5.9km of twin tunnels running beneath the Brisbane River and CBD with four new underground stations at Boggo Road, Wolloongabba, Albert Street and Roma Street.
The project also provides a new above ground station at Exhibition, a rebuild for seven stations between Dutton Park and Salisbury, construction of three new stations on the Gold Coast, delivery of two new stabling and maintenance facilities, and commissioning of a new world class signalling system.
JAGCON Group worked with the CPB Contractors, BAM, Ghella, UGL Joint Venture (CBGUJV) providing project management services, expert advice on constructability & senior engineers throughout the lifecycle of the project.
Project Services:
– SME Reviews
– Strategic Advice
– Planning & Constructability
Project Delivery Roles:
– Senior Project Engineer
– Project Engineers
– Site Engineer
The Tunnel & Station Excavation (TSE) project is the second stage of the Sydney Metro network that connects stage 1 at Chatswood to the existing heavy rail at Sydenham.
The connection consists of twin 15.5km TBM tunnels that cross beneath Sydney Harbour and includes the complex excavation of underground caverns to facilitate new stations at Chatswood, Crows Nest, Victoria Cross, Barangaroo, Martin Place and Pitt Street (Gadigal) with an open cut station box excavation at Waterloo.
JAGCON Group worked with the John Holland CPB Contractors Ghella Joint Venture (JHCPBG) providing project management services, expert advice on constructability and senior engineers throughout the lifecycle of the project. JAGCON Group assisted JHCPBG from the pre-contract phase right through the delivery up to project completion.
Project Services:
– Request for Tenders (RFTs)
– Design Development
– Project Management
– Planning & Constructability
– Digital Engineering
Project Delivery Roles:
– Construction Manager
– Project Manager
– Project Engineer
– Senior Tunnelling Designer & BIM Technician
– Methods and Planning Manager (Tender Phase)
– Procurement Officer (Tender Phase)
Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Senior Project Engineers
– Project Engineer
– Electrical Engineer
Formerly known as North West Rail Link (NWRL)
Sydney, NSW
Sydney Metro Northwest is the first stage of Sydney Metro, which included 15 km of twin TBM tunnels connecting the new viaduct rail at Bella Vista and the existing Sydney Trains network at Epping.
The works also included hard rock tunnelling, excavation, and cavern construction of new stations at Bella Vista, Norwest Business Park, Hills Showground, Castle Hill, and Cherrybrook, along with two service shafts.
JAGCON Group worked with the Thiess, John Holland, Dragados Joint Venture providing project management services, expert advice on constructability, and senior engineers throughout the lifecycle of the project.
JAGCON Group assisted the project through the tender phase and throughout the entirety of the delivery.
Project Services:
– Request for Tenders (RFTs)
– Design Development
– Project Management
– Planning & Constructability
– Digital Engineering
Project Delivery Roles:
– Project Manager
– Senior Project Engineer
– Methods & Planning Manager (Tender Phase)
– Methods & Design Engineer
– Tunnelling Structural/Civil Designer
– Production Administrator
Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Site Engineer