Sydney Metro City & Southwest – Tunnel & Station Excavation (TSE)

Sydney, NSW

Project Description

The Tunnel & Station Excavation (TSE) project is the second stage of the Sydney Metro network that connects stage 1 at Chatswood to the existing heavy rail at Sydenham.

The connection consists of twin 15.5km TBM tunnels that cross beneath Sydney Harbour and includes the complex excavation of underground caverns to facilitate new stations at Chatswood, Crows Nest, Victoria Cross, Barangaroo, Martin Place and Pitt Street (Gadigal) with an open cut station box excavation at Waterloo.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the John Holland CPB Contractors Ghella Joint Venture (JHCPBG) providing project management services, expert advice on constructability and senior engineers throughout the lifecycle of the project. JAGCON Group assisted JHCPBG from the pre-contract phase right through the delivery up to project completion.

Project Services:
– Request for Tenders (RFTs)
– Design Development
– Project Management
– Planning & Constructability
– Digital Engineering

Project Delivery Roles:
– Construction Manager
– Project Manager
– Project Engineer
– Senior Tunnelling Designer & BIM Technician
– Methods and Planning Manager (Tender Phase)
– Procurement Officer (Tender Phase)

Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Senior Project Engineers
– Project Engineer
– Electrical Engineer

Our Work

Sydney Metro Northwest – Tunnel & Station Civil Works (TSC)

Formerly known as North West Rail Link (NWRL)
Sydney, NSW

Project Description

Sydney Metro Northwest is the first stage of Sydney Metro, which included 15 km of twin TBM tunnels connecting the new viaduct rail at Bella Vista and the existing Sydney Trains network at Epping.

The works also included hard rock tunnelling, excavation, and cavern construction of new stations at Bella Vista, Norwest Business Park, Hills Showground, Castle Hill, and Cherrybrook, along with two service shafts.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the Thiess, John Holland, Dragados Joint Venture providing project management services, expert advice on constructability, and senior engineers throughout the lifecycle of the project.
JAGCON Group assisted the project through the tender phase and throughout the entirety of the delivery.

Project Services:
– Request for Tenders (RFTs)
– Design Development
– Project Management
– Planning & Constructability
– Digital Engineering

Project Delivery Roles:
– Project Manager
– Senior Project Engineer
– Methods & Planning Manager (Tender Phase)
– Methods & Design Engineer
– Tunnelling Structural/Civil Designer
– Production Administrator

Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Site Engineer

Our Work

West Gate Tunnel Project

Melbourne, VIC

Project Description

Massive West Gate Tunnel Project in VIC reaches new milestone

The West Gate Tunnel Project, which commenced construction in 2020, is a major infrastructure initiative designed to improve Melbourne’s road network by easing congestion and enhancing connectivity. The project features a 6.5-kilometer toll road, including 2.8 kilometers of twin tunnels running beneath the Yarra River. These tunnels will provide an alternative to the heavily congested West Gate Bridge, reducing reliance on the existing structure and offering a more efficient route for commuters and freight transport.

In addition to the tunnels, the project includes widening the West Gate Freeway, constructing new bridges, and creating improved access to key industrial and commercial hubs. A key objective is to improve freight efficiency, particularly for trucks traveling to and from the Port of Melbourne, by reducing travel times and minimising bottlenecks. The upgraded road network is expected to enhance overall road safety, support economic growth, and provide new cycling and pedestrian paths, contributing to a more sustainable transport system.

With a total project value of $11 billion, the West Gate Tunnel Project is a significant investment in Melbourne’s future transport infrastructure. The construction is being carried out by CPB Contractors and John Holland, with CPB Contractors responsible for the $3.3 billion tunnel section. Once completed, the project is expected to significantly cut travel times, ease congestion on local roads, and improve air quality by reducing traffic-related pollution in residential areas.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the CPB Contractors John Holland Joint Venture providing digital engineering and construction methods support throughout the lifecycle of the project.

Project Delivery Roles:
– Senior Project Designer – Civil/Structural
– Senior Tunnelling Draftsman

Project Services:
– Digital Engineering
– Planning & Constructability

Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Project Engineer

Our Work

WestConnex Rozelle Interchange

Sydney, NSW

Project Description

The WestConnex Rozelle Interchange consists of a 17 kilometre network of tunnels functioning as a new underground motorway interchange which provides connectivity to the M4-M5 Link Tunnels, the new M8 tunnels and the City West Link.

The interchange also provides an underground bypass of the congested Victoria Road between the Iron Cove Bridge and the Anzac Bridge, and a stub connection to the future Western Harbour Tunnel.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the John Holland CPB Contractors Joint Venture (JHCPBJV) providing digital engineering and construction methods support throughout the lifecycle of the project.

Project Delivery Roles:
– Senior Tunnelling Drafter
– Methods and Planning Designer – Surface Works

Project Services:
– Digital Engineering
– Planning & Constructability

Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Senior Project Engineer
– Project Engineer

Our Work

WestConnex M8

Formerly known as The New M5
Sydney, NSW

Project Description

The M8 Motorway, formerly known as The New M5, is a 9-kilometre twin road tunnel stretching from Kingsgrove to St Peters, making it the longest road tunnel in Australia.

The project involved 18,000 workers who collectively spent 21 million hours on the job.

The M8 includes a four-level interchange at St Peters featuring 10 bridges, two of which span the Alexandra Canal.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the CPB Contractors, Dragados, Samsung Joint Venture providing construction methods, quality coordination, and digital engineering support throughout the lifecycle of the project.

Project Services:
– Request for Tenders (RFTs)
– Design Development
– Planning & Constructability
– Quality Assurance
– Digital Engineering

Project Delivery Roles:
– Construction Methods & Design Engineer (Tender Phase)
– Quality Administrator
– Senior Tunnelling Drafter

Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Principal Tunnel Engineer (Independent Certifier)
– Site Engineers
– Electrical Engineer

Our Work

WestConnex M4 East

Sydney, NSW

Project Description

The M4 East Motorway, a significant part of Sydney’s WestConnex project, is a 7-kilometre roadway including a 5.5-kilometre tunnel. This project was completed in 2019.

It links North Strathfield to Haberfield, enhancing transport networks by providing three lanes in each direction.

The motorway’s objectives include improving traffic flow, facilitating urban revitalisation along Parramatta Road, and better integrating Sydney’s west and south-west with the city, airport, and port.

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the CPB Contractors, Samsung C&T, John Holland Joint Venture providing design coordination and site administration support throughout the lifecycle of the project.

Project Services:
– Design Development
– Mechanical / Electrical Engineering
– Claims & Variations Assistance
– Contract Administration

Project Delivery Roles:
– Design Coordinator
– Senior Site Administrator