The first stage of the Suburban Rail Loop – SRL East – is a fully-tunnelled 26-kilometre metro corridor between Cheltenham in the South and Box Hill in the North. The line will include six stations, including new interchanges with existing heavy rail stations at Cheltenham, Clayton, Glen Waverley and Box Hill, with new stations at Monash and Burwood.
The Suburban Rail Loop Authority (SRLA) has separated SRL East into seven packages. Included in the scope of Works Package C is:
– Tunnelling and cross passages over the 16-kilometre Cheltenham and Glen Waverley section, and;
– Clayton and Monash station box excavations, including temporary retaining structures.
JAGCON Group worked with the CPB Contractors Ghella Acciona Joint Venture providing SME reviews, digital engineering support & senior engineers throughout the lifecycle of the project.
Project Services:
– SME Reviews
– Value Engineering
– Strategic Advice
– Planning & Constructability
– Digital Engineering
Project Delivery Roles:
– Senior Electrical Engineer
– Digital Engineer