M6 Stage 1

Sydney, NSW

Project Description

Transport for NSW’s M6 Stage 1 project features twin 4km tunnels linking the M8 Motorway at Arncliffe to President Avenue at Kogarah. The works involve complex roadheader tunnelling through varying geology, the construction of a dive portal structure, and upgrades and tie-ins to existing road infrastructure.

– 4km twin road tunnels

– Excavation:

– Roadheaders in Hawkesbury Sandstone
– Excavators in sands and clay with jet-grouting treatment

– 125m open cut + 230m cut & cover excavation (with top-down construction method)

– 2 caverns: section up to 267m²

– 3-lane tunnels: section up to 182m²

– 27 cross passages

TfNSW Website    CPB Website    Ghella Website    UGL Website

Download Project Sheet (.pdf)

Our Role &
People Involved

JAGCON Group worked with the CPB Contractors, Ghella and UGL joint venture (CGU) providing project management services, constructability advice & senior engineers throughout the lifecycle of the project.

Project Delivery Roles:
– Senior Project Engineer
– Project Engineers
– Site Engineers
– Quality Administrator

Project Services:
– Planning & Constructability
– Quality Assurance