Formerly known as North West Rail Link (NWRL)
Sydney, NSW
Sydney Metro Northwest is the first stage of Sydney Metro, which included 15 km of twin TBM tunnels connecting the new viaduct rail at Bella Vista and the existing Sydney Trains network at Epping.
The works also included hard rock tunnelling, excavation, and cavern construction of new stations at Bella Vista, Norwest Business Park, Hills Showground, Castle Hill, and Cherrybrook, along with two service shafts.
JAGCON Group worked with the Thiess, John Holland, Dragados Joint Venture providing project management services, expert advice on constructability, and senior engineers throughout the lifecycle of the project.
JAGCON Group assisted the project through the tender phase and throughout the entirety of the delivery.
Project Services:
– Request for Tenders (RFTs)
– Design Development
– Project Management
– Planning & Constructability
– Digital Engineering
Project Delivery Roles:
– Project Manager
– Senior Project Engineer
– Methods & Planning Manager (Tender Phase)
– Methods & Design Engineer
– Tunnelling Structural/Civil Designer
– Production Administrator
Additionally, current JAGCON Group staff have previously fulfilled the following delivery roles on this project:
– Site Engineer